Sludge Trial Calculation

Please fill in the table below as completely as possible to facilitate the trial calculation results.

  • Note 1
    The initial calculation is based on a moisture content of 40%. The moisture content after drying will be adjusted according to the customer's actual needs and is not fixed at 40%.
    Moisture content = Water content / (Dry weight of sludge + Moisture content)
  • Note 2
    The waste removal fee is based on the average price of each waste removal company and may vary.
  • Note 3
    Electricity prices are based on those announced by Taiwan Power Company and may be subject to change.